SURVEYING
Site surveying and set out
Site surveying and set out
Answer 1
The laser level, which is also known as automatic level, can be used in this case to calculate the reduced levels from the set datum. This machine is based on the principle that for the establishment of point levels, the setting ...
Rating
CONSTRUCTION PROCUREMENT
Construction Procurement
[Writer's initials]
Construction Procurement
Introduction
To survive in a changing world construction companies should review their goals and strategies to bring themselves into line with changes in the external environment and the organizations. Development and revision of strategy is a real need for significant changes in the external environment, ...
Rating
TRENCHLESS CONSTRUCTION
Trenchless Construction
Trenchless Construction
Introduction
Trenchless technology includes all methods of underground utility construction and renewal with minimum surface disruptions. It is divided into two main areas of trenchless construction: installation of new utilities, and pipeline renewal for renewing old and deteriorated utility systems. This article evaluates some project parameters ...
Rating
CDM 2007
Construction design management 2007
Construction design management regulation 2007
CDM 2007
The regulations presented in the year 1994 and 1996 for the construction industry are not very effective and complains are arrived from all over the world related to the non-effectiveness and lack of management in the applicable regulation before this regulation. ...
Rating
Electrical Principles in Building Services Engineering
Introduction
Founded in 1901 in England as the world's first standards body, BSI Group has grown to become one of the main organizations of business services with more than 80,000 customers. Present in 120 countries, with more than 50 local branches and about 2,400 employees, BSI is now one ...
Rating
SAFETY IN CONSTRUCTION
Health, Safety and Welfare in Construction and the Built Environment
Health, Safety and Welfare in Construction and the Built Environment
P1
The role of the parties can be easily understood, in that the nature of job and the roles of the various parties involved in the construction project ...
Rating
DESIGNING A SIMPLE LINKAGE BETWEEN TWO FUEL TANK RESERVOIRS
Designing a Simple Linkage between Two Fuel Tank Reservoirs
Designing a Simple Linkage between Two Fuel Tank Reservoirs
Summary
Using an aircraft fuel tank as an industrial case-study, the paper describes some recent research developments at BAE SYSTEMS that allow the airframe and ...
Rating
Low Energy PIC Data Acquisition System
Abstract
A Data Acquisition System is developed as for the PIC microcontroller design A microcontroller is a processing unit of the microprocessor type information which has been added to the internal devices for performing fixtures without requiring the addition of components of annexes. A microcontroller ...
Rating
WATER& DRAINAGE
Water and Drainage Infrastructure
Water and Drainage Infrastructure
Introduction
A wetlandis an area in the transition zone,where dry to permanently moist ecosystems lies. The concept of wetland habitat is comprised of various types such as swamp, marsh, swamp forest, wet meadow, marsh ditch, meadow or reed. Flora and faunaare on the full-year surplus of water adjusted.Since 1999, seven wetlands had been constructed in ...
Rating
Construction Management
Construction Management
Assignment 5
If the precise nature of a portion of the work is not defined at the time of tendering, the tender documents may include a requirement that the tenderers include in their total prices a certain amount as a provisional sum , as recognition that the successful contractor ...