Construction Phase

Read Complete Research Material

CONSTRUCTION PHASE

CONSTRUCTION PHASE

Construction Phase

Introduction

Construction Planning Phase

In the planning Phase of the Construction project the construction team identifies the solution in detail analysis of what to build, what would be the steps of carrying out construction phase, who will be the people involving in this phase and the defining time management plan for this phase. In this phase the legal constraints like bye laws and open built ratio, foot prints and other considerations are highlighted and study.

The building control authority provides with the legal documentation to prove the design accordingly. The plot distribution and the town planning factors are considered in it. The disability management and other health safety measure are also included in this phase. The access to disable people without discrimination is also included in the legislation of construction like the Act of 2005,states that the disable people should be treated normally at their work places and public places.

This phase of the planning concludes in the form of the approval of the Project plans. This step indicates that the design and project team, the client and the main stakeholders of the project, all agrees on the planning concept, its design development and its detailing. The plans which are created by the team mates for the purpose of the testing, communications and safety measures are rolled up in the master plan which the project manager synchronizes. The design team's objective throughout this phase is to manuscript the solution to the extent at which the design team may able to create and organize the solution in a time saving and gainful aspect. These credentials are measured ongoing process, as they will be upgraded from time to time during the Planning Phase (Anonymous 2012)

.

Conscientious work in the Planning Phase, that repeatedly engages numerous iterations of strategy and timetable, should moderate hazards and amplify probability for achievement. The group keeps on recognizing each one of possibility all through the stage, and it deal with innovative hazard as they appear.

Client side structure

The Client has various tasks and it is quite usual to segregate these tasks among many individuals in order to have suitable management plan that can be put into practice and divergence of the concerns can be avoided(Anonymous 2012).

A representative Client-side composition is show below:

The External Team

The external team of the construction phase comprises of the people mainly involved in the designing phase of the building as well as the team that is running the project from the very start till the end. Project Manger is the leading post in the team of the external expertise.

The design Team consists of:

Architect

Quantity surveyor

Senior Mechanical Engineer

Senior Electrical Engineer

Structural Engineer

Com Coordinator

The Subcontractor

The responsibilities require to be accomplished all through the Planning stage are depicted in the table below. This development guide depicts the procedures and task mandatory to achieve them. Comprehensive information precise to every movement project regarding every charge, particularly technological information, is presented in the migration lead for that scheme.

Elements of the construction project

The representative configuration of a scheme is as depicted below ...