CONSTRAINTS OF PROJECT ON A PLAYGROUND

Constraints of project on a playground

Constraints of project on a playground

a) Timing

The time frame to plan, create, implement and execute the entire project was approximately 12 weeks from start to finish, dedicating a total of eight full class periods (forty minutes in length) to its end. The class periods were utilized in connection to the study of the various units that related to this project. For example:

We conducted the survey while we studied statistics.

We developed the price guide while we studied basic operations with whole numbers and decimals.

We constructed the initial drawings when we studied ratio, ...