I would take this opportunity to thank my research supervisor, family and friends for their support and guidance without which this research would not have been possible.
DECLARATION
I, [type your full first names and surname here], declare that the contents of this dissertation/thesis represent my own unaided work, and that the dissertation/thesis has not previously been submitted for academic examination towards any qualification. Furthermore, it represents my own opinions and not necessarily those of the University.
SIGNED __________________ DATE _________________
ACKNOWLEDGEMENTii
DECLARATIONiii
CHAPTER 01: INTRODUCTION1
Introduction and Background of the problem1
Purpose of the Study1
CHAPTER 2: LITERATURE REVIEW3
Risks in Power Station development3
Types of Risks in Power Station Development3
Engineering Risks4
Procurement Risks4
Construction Risks5
Financial Risks6
Operational Risks6
Strategic Risks7
Risk Management in Power Station Development Project8
CHAPTER 03: METHODOLOGY10
Research technique10
Data Collection10
Online Desk Research10
Limitations11
CHAPTER 04: DESCRIPTION AND ANALYSIS OF RESEARCH FINDINGS12
Managing risks through risk management strategy12
CHAPTER 05: CONCLUSION15
REFERENCES16CHAPTER 01: INTRODUCTION
Introduction and Background of the problem
With the advent of 21st century, the world started progressing at an unprecedented rate. These advancements caused the rapid growth of energy market as well. The demand for the energy sources as also increased up to significant extent. Due to increased prices of fossils fuels, global warming and increased awareness of other prevalent and sensitive environmental issues emphasizes the need for environment friendly and cost effective solutions for traditional power stations. Modern technological solutions have helped the traditional fossils fuelled power plants to improve their operational efficiency and have less harmful impacts on the environment in the form of hazardous wastes. The increased awareness about the renewable technologies have also not been able to replace the traditional fossil fuelled power stations because of the fact that they still have some gaps to bridge in becoming the fault free electricity producers. Besides this, the high investment cost also becomes an issue when it comes to adopting renewable technological solution for substituting the fossil fuel power stations (Kirby, 2004, p.n.d.).
Purpose of the Study
Power plant development projects a considered to be very capital concentrated and are susceptible risks that could be inter connected and can impact the performance of a power plant project. With any reason whatsoever the failure to deliver a running and operational power development project can come as a shock to all the stakeholders of the project. To carry out such project with effective management of risks and the opportunities of minimizing them is very important (Asbjorg, 2012, p.204).
The increased pollution for the traditional power stations is causing great concern to the environment. As discussed above the need for controlling the problem is required. The instant solution sound in financially is the renovation of the traditional fossil fuelled power station using environment friendly and anti polluting technological solutions. The problem identified in this technique is the presence of risks and the issues for the development of the power stations. Therefore, steps need to be ensured in order to make the development projects with minimized risks if not risk free. The purpose of this study is to carry out a research to achieve the ...