Mayor Schell

Read Complete Research Material

MAYOR SCHELL

Mayor Schell

Mayor Schell

Introduction

The following analysis is the Case study Mayor Schell's Zero Homeless Family Strategy. This debate would be analyzing the four policy choices of Mayor Schell that were part of the strategy for the homeless and detailed upon the pre-Implementation and Design Strategies of Mayor Schell. This debate would also be analyzing the four practical outcomes of his choices accordingly reconstruct four steps took by Mayor Schell in order to re engineer the program and shaped the original objectives. The debate would be concluding by analyzing the strategies but also the four reasons for the importance of conducting assessments prior to the new program implementation.

Answer 1)

The four policy choices of Mayor Schell that made as part of the strategy for the homeless were the few district plans that include design guidelines chosen by residents to preserve the character of their neighborhoods. These will become the basis for design review which now required for all multi- family and mixed-use projects. However, there is Neighborhood wish lists vary from one plan to another. There are plain vanillas" priorities: preserve and spruce up neighborhood parks, add pedestrian amenities, encourage the mixed-use development. For some parties the focus was culture and the arts, but for the other parties it was an economic development. Still others have bound in with both feet, seizing the opportunity to define their own urban village. As a part of its plan, the neighborhood will apply for approval of its own zoning overlay, a historic conservation district that will provide incentives for the preservation of existing structures and encourage the addition of housing above storefronts. Members of the planning group are aggressive about preserving affordable housing. The structure was for the 1962 world's fair in Seattle Center, still a tourist destination. The Pacific Science Center has expanded with an exuberant Imax theater set into a glass box to complement the soaring arches of the original building. And on the east side of the complex, the original monorail cuts through the middle of Paul Allen's rock and roll museum, which will open next summer (www.environ.ie).

Answe2)

Pre-Implementation and Design Strategies of Mayor Schell were creating urban land trusts to ensure that rental prices do not rise out of reach of their neighbors. In Belltown, north of the Pike Place Market, residents and land owners hired a team that included public artists and landscape architects to redesign several blocks of Vine Street, a long corridor that runs from Seattle Center to the uplands along the bay. They envision a pedestrian streetscape that includes colorful alleys, miniature gardens, and sculpted hillside terraces. The ambitious plan was ready for city approval, which would direct storm water into a landscaped filtration system that would release into Elliott Bay. Belltown and other neighborhoods benefited from professional planning services. Each community got $80,000 to hire consultants to guide it through the planning and review process-- and beyond, if desired. The results, say the consultants, have been mixed (www.lambeth.gov.uk/).

Answer 3)

The four steps taken by Mayor Schell to ...
Related Ads