Is the employer main contributor in construction project delay in United Arab Emirates?
by
ACKNOWLEDGEMENT
I take this chance to be grateful and thankful to all those individuals who have been the reason that I was able to do this research. I am very thankful to my research supervisor for guiding me through every problem and issue, I am highly appreciative of my family and friends who supported me through my endeavor on this research and it is because of you all that I was able to finish it up to the required levels of expectations.
DECLARATION
I, [full first names and surname here], hereby declare that the findings and contents of this thesis and/or dissertation fully represents my individual work which was completed by myself and I was not aided by anyone in its formation. The thesis/ dissertation that I am submitting has been done through my own efforts and was not submitted as a previously done dissertation/thesis by anyone else towards any qualification. Furthermore this thesis/ dissertation represent my own opinions and is not necessarily supported or furthered by the University.
Signed __________________ Date _________________
ABSTRACT
This study investigates the topic and tries to find the answer to the question that “is employer a key contributor in the construction project delay in construction industry in United Arab Emirates?”. The Confederation has seen a bundle of boom in the recent years particularly in the construction industry. The government has tried to move away from the income of the oil wells and therefore developed the tourism side. For that large mega projects were undertaken. The research builds upon the previous researches done by various scholars in this field. All the researches have been mentioned in the literature review chapter of the study. Using the literature review a questionnaire was then developed and distributed among hundred respondents at random were chosen from the population. The detailed methodology of the questionnaire design along with the analysis of the results have been discussed in chapter three of the study. The next chapter tries to correlate what the questionnaire results have indicated and what has been found from the literature review. A detailed analysis is done to see the extent to which the literature review supports the findings of the questionnaire. The last chapter consists of the conclusion of the whole study followed by the recommendations.
ACKNOWLEDGEMENTII
DECLARATIONIII
ABSTRACTIV
LIST OF FIGURESVIII
LIST OF TABLESIX
CHAPTER ONE: INTRODUCTION1
Rationale for the Research2
Problem Statement2
Aim and Objectives of the Research4
Research Methodology4
Summary7
CHAPTER TWO: LITERATURE REVIEW8
Introduction8
The United Arab Emirates Construction Industry Overview8
Delay in Construction Projects10
Type of delays11
Compensable delays11
Non- Excusable (Inexcusable delays delay)12
Excusable Delays12
Excusable Compensable Delays13
Excusable Non Compensable Delays13
Concurrent delays14
Causes of delay14
Design related causes14
Construction related causes15
Finance related causes15
Administration related causes15
Summary16
Summary of Chapter17
CHAPTER THREE: METHODOLOGY DESIGN AND RESULT ANALYSIS18
Introduction18
Methodology Design18
Questionnaire Design and Approach18
Structure19
Section A of the Questionnaire20
Result Analysis20
Data Collection20
Questionnaire Result21
Section A Analysis22
Cause of Delay26
Summary38
CHAPTER 4: DISCUSSION OF PRIMARY RESEARCH RESULT IN RELATION TO40
SECONDARY RESEARCH40
Introduction40
Discussion40
Possible Factors or Delays41
Other Issues for the Delay in Construction Projects42