Canal Operating Calculations
CANAL OPERATING CALCULATIONS
Canal Operating Calculations
Part (i)
Question (a)
The linear length of the canal track associated with the proposed angle of the incline
Answer:
Question (b)
The velocity of the moving canal lock
Answer:
We know that
Hence
Taking and
The result from the velocity formula,
Will also yield the same velocity
Question (c)
The water saving achieved per lift compared to original series of locks
Answer:
Number of lifts per day:
Commercial = 10
Pleasure = 30
Load displacement:
Commercial = 400T
Pleasure = 20T
Total displacement:
Hence on any particular day, an average of 4600T of water is saved.
Question (d)
The cost of each lift
Total Load
Total Cost
Cost per Lift
Hence the cost of each lift ...