OLYMPIC

Highway and Transport

Highway and Transport

Transport

Transport links in London are quite good, also is being done to ensure that the public can get to the venues on time and relatively comfortable. The transport infrastructure of London will be enhanced by extending the line east of the London Underground. There will be several improvements to the Light Rail operating in the Docklands area.

Similarly, there can be plans to create a service for high-speed train the Olympic Javelin which will carry passengers between St. Pancras International station (from where the EuroStar) to the Olympic Park. It will also enable a number of parking spaces and venues in and around the M25 which is the road around the Greater London area where you use vehicles with low carbon emissions (Forecast, 2001, 165).

The transport problem is a serious challenge to the British capital, and London should reconsider its plan to organize the traffic and set restrictions on entry to the city center to ensure patency of roads. London has a highly developed public transport network, and therefore, the City will encourage the public attending the Olympic Games, to use exactly these kinds of transport. The ticket to the Olympic Games will be accessible transportation card, which will operate during the day after receipt and will allow free travel on the territory between the 1st and 9th districts of the city on buses, subways and other modes of public transport.

It has happened before the London intelligent congestion of public transport. The increasing flow of passengers during the Olympics and to reduce waiting time of transport, the London authorities will have to reduce the burden on transportation by 30 percent. In this regard, it is expected that during the Olympic Games in London the company will adjust the time of arrival of workers at work, and maybe even invite them to work at home or get to the place of alternative routes (Law, 1993, 200).

In addition, London's transport department has developed its route network for the movement of special transport athletes, officials and media during the Olympic Games. This network is paved with regard to the special signals changes, detours, main roads and the temporary opening of dedicated lanes for specific vehicles. This will ensure the most comfortable travel in the city of Olympians at play.

The public transport, one of the worst aspects was noted in the initial evaluation of the IOC, was a great focus to the planning numerous improvements, including the extension of East London Line, a line of meter London, and improvements to the Docklands Light Railway, a light rail, and the North London Line, as well as the modern Olympic Javelin. This is the largest improvement project in the proposed transport system, in London, and in general, it is assumed that the early stages of the process of nominations could not have been overcome without the assurance that this project was finished in 2012 (Ingerson, 2000, 239).

They need to ensure, that 80% of athletes will be housed within 20 minutes of their various ...