Science Project


SCIENCE PROJECT

Science Project

Science Project

In order to operate the machine, five switches must be set to the “on” position: the switch on the power strip, the switches on each of the Variacs and the switches on the two furnace blowers. The only part that needs to be plugged in is the power strip.

The lid fits snugly over the top of the chamber and is a little difficult to put on the chamber. To replace the lid, stand behind the machine and put the front half onto the chamber. The front and back sides should be marked. Once the front section is in ...
Related Ads